
6
Setting GUD and GCD Manifold
Pressure
A tapped opening is provided in the gas manifold (Fig-
ure 10) to facilitate measurement of the manifold pres-
sure. A "U" tube manometer having a scale range from
0" to 12" W.C. should be used for this measurement.
The manifold pressure must be measured with the
burners operating and with the shield and air box front
cover in place. Adjustment screw cover must be in
place when furnace is operating. Be certain the grom-
met around the manifold tightly seals the air box.
A
B
Gas Valve
Burner
Box
C
U-Tube Manometer
Vent
Blower
A - CAP OVER ADJUSTMENT SCREW MUST
BE IN PLACE WHEN FURNACE IS
OPERATING.
TO MEASURE MANIFOLD PRESSURE CON-
NECT MANOMETER BETWEEN B AND C.
B - HOSE BETWEEN GAS VALVE AND AIR
BOX (TEE TO BE SUPPLIED BY
SERVICER.)
C - TAPPED OPENING IN MANIFOLD (HOSE
BARB TO BE SUPPLIED BY SERVICER.)
Figure 10
WARNING
To prevent death or personal injury due
to carbon monoxide, all hoses must be
connected as shown in Figure 10. Fail-
ure to connect the hose between the
pressure switch and the burner box
could result in excessive generation of
carbon monoxide.
Comentarios a estos manuales